• Home
  • Media
  • Careers
  • Contact us
Logo of DPCleantech-Biomass and clean energy company
  • About us
    • DP Business Units
    • Top Management
    • Past & future
  • Technologies & Capabilities
    • Combustion Technologies
      • DP WCV Grate
      • EcoMulti Boiler
      • MaxMulti Boiler
      • MaxSolo Boiler
      • MaxMulti Plus Anti-Corrosion Boiler
      • DP Specialist Boiler
    • Biogas Technologies
      • ADOS System
      • DAD
      • OrganiPrep Pre treatment System
      • Agricultural and Animal Waste Solution
    • Multiwaste Plant Solutions
      • Advanced Integrated Multiwaste System (AIMS)
    • Solid Waste Treatment
      • Material recovery and treatment
      • Refuse derived fuel (RDF) plants
      • Composting plants
    • Landfill Treatment and Remediation
      • DP Smell-Well System
      • Landfill Mining and Rehabilitation
      • Landfill Closure and De-Gassing
      • Design, Construction and Operation of Landfills
    • Emissions management technology
      • Flue Gas Cleaning
    • Automation and control technology
      • DP Advanced Automatic Control
    • Gasification Technology
      • Energos
    • Plant optimisation
      • DUBLIX Engineering
      • TISKA GmbH
    • Waste water treatment technology
      • Gyrecat Technology
    • Standalone technologies
      • DP OrganiPrep Pre treatment
      • Boiler Technologies
      • Fuel Handling Equipment
      • Ash Handling Technology
    • Consultancy
      • End to End approach
      • Project feasibility
      • Needs & Fuel assesment
      • Design & Pre-Engineering
      • Manufacturing, Procurement & Installation
      • Project Management & Project Delivery
      • Commissioning
      • Operator Training & Automation
    • Research and Development
      • Continuous improvement and new initiatives
      • Design and Engineering excellence
      • Design Engineering tools
      • Patented technology and accreditations
      • Quality Assurance
    • Manufacturing
  • Fuels & Water treatment
    • Municipal Solid Waste & RDF
    • Organic Waste Fuels
    • Complex Biomass Fuels
    • Mixed Fuel Biomass
    • Straw Biomass
    • Waste Wood Biomass
    • Napier Grass
    • Water Resources
  • Projects & References
    • Map

Testimonials

Peer-categories: About Us   Media   Careers   Contact Us   Technology and Capabilities   Fuel & Water Treatment   Project Case Studies   Promoted content   Testimonials   Partners   Frontpage   Projects statistics   Static page
Search / Filtering
Text Search
Filters changed, please click to submit when done
All ABCDEFGHIJKLMNOPQRSTUVWXYZ
0123456789
  • NBE Pizhou Biomass Energy Co., Ltd.

    Monday, 07 December 2015 Super User
    Average rating
    444 NBE Pizhou Biomass Energy Co., Ltd. /site_content/testimonials/nbe-pizhou-biomass-energy-co-ltd

    NBE Pizhou biomass energy project was connected to the grid on 24th October 2015 and successfully completed the 72+24 hours trial run on 29th October 2015. This was the shortest period between grid connection to trial run that we have ever achieved. The equipment was promptly delivered during installation and operated well during the trial run. Our thanks go to DP CleanTech for helping to ...

    Categories Testimonials
    Read more...
  • Everbright International’s CEO Mr. Chen Xiao Ping

    Monday, 07 December 2015 Super User
    Average rating
    436 Everbright International’s CEO Mr. Chen Xiao Ping /site_content/testimonials/everbright-international-s-ceo-mr-chen-xiao-ping

    DP CleanTech is a world leading renewable energy solutions provider. By cooperating with DP CleanTech, we are going to achieve a win-win situation. Systematically utilizing agricultural straws will ...

    Categories Testimonials
    Read more...
  • NBE Linyi Biomass Energy Co., Ltd.

    Monday, 07 December 2015 Super User
    Average rating
    432 NBE Linyi Biomass Energy Co., Ltd. /site_content/testimonials/nbe-linyi-biomass-energy-co-ltd

    Our project, NBE Linyi biomass energy project was successfully connected to the grid on 11th October 2011. During the project construction and installation phase the boiler equipment was delivered ...

    Categories Testimonials
    Read more...
  • NBE Ningyang Biomass Energy Co., Ltd.

    Monday, 07 December 2015 Super User
    Average rating
    430 NBE Ningyang Biomass Energy Co., Ltd. /site_content/testimonials/nbe-ningyang-biomass-energy-co-ltd

    Sincere thanks to DP CleanTech for their continuous support on our project for civil works, equipment installation, power plant commission, technical guidance, equipment maintenance and grid ...

    Categories Testimonials
    Read more...
  • Weifang Huawei Thermal Power Co., Ltd.

    Friday, 04 December 2015 Super User
    Average rating
    428 Weifang Huawei Thermal Power Co., Ltd. /site_content/testimonials/weifang-huawei-thermal-power-co-ltd

    DP CleanTech has played an important role in our business and has continually supported our project from the initial project consultation through to contract signing, technical design, equipment ...

    Categories Testimonials
    Read more...

About Us

  • DP Business Units
  • Top Management
  • Past & Future

Technologies & Capabilities

  • Combustion Technologies
  • Biogas Technologies
  • Multiwaste Plant Solutions
  • Solid Waste Treatment
  • Landfill Treatment and Remediation
  • Emissions Management Technology
  • Automation and Control Technology
  • Gasification Technology
  • Plant Optimisation
  • Waste Water Treatment Technology
  • Standalone Technologies
  • Consultancy
  • Research and Development
  • Manufacturing

Fuels & Water Treatment

  • Municipal Solid Waste & RDF
  • Organic Waste Fuels
  • Complex Biomass Fuels
  • Mixed Fuel Biomass
  • Straw Biomass
  • Waste Wood Biomass
  • Napier Grass
  • Water Resources

Projects & References

  • Project Case Studies
  • Map
  • Home
  • Media
  • Careers
  • Contact us
© Copyright DP CleanTech 2025
SEO China |