NBE Pizhou biomass energy project was connected to the grid on 24th October 2015 and successfully completed the 72+24 hours trial run on 29th October 2015. This was the shortest period between grid connection to trial run that we have ever achieved. The equipment was promptly delivered during installation and operated well during the trial run. Our thanks go to DP CleanTech for helping to ...
DP CleanTech is a world leading renewable energy solutions provider. By cooperating with DP CleanTech, we are going to achieve a win-win situation. Systematically utilizing agricultural straws will ...
Our project, NBE Linyi biomass energy project was successfully connected to the grid on 11th October 2011. During the project construction and installation phase the boiler equipment was delivered ...
Sincere thanks to DP CleanTech for their continuous support on our project for civil works, equipment installation, power plant commission, technical guidance, equipment maintenance and grid ...
DP CleanTech has played an important role in our business and has continually supported our project from the initial project consultation through to contract signing, technical design, equipment ...