Energos™
DP’s gasification solution is a commercially proven European waste to energy gasification technology from Energos. This extensively proven technology is suitable for converting all types of non-recyclable commercial and household waste to energy; and has the added benefit of very low emissions. The patented technology is highly flexible and modular, to meet smaller scale needs for distributed power and can be expanded accordingly to optimise fuel processing capacity and energy production.
Energos technology is commercially successful and technically proven since 1997. With over 800,000 operating hours at 8 plants across Europe, and with availability levels of up to 8,000 hours p/a, the plants are commercially successful. With this and help local authorities meet the EU Landfill Directive.
The ENERGOS plant design is offered with two standard boiler capacity designs:
There are two standard module sizes that relate to the fuel processing capacity of the gasifier. They have the nominal capacity to treat either 5 tonnes per hour or 6 tonnes per hour.
Click here to view the Energos process.
1 Fuel bunker
2 Fuel crane
3 Hopper
4 Primary chamber (Gasification)
5 Secondary chamber (High temperature oxidation)
6 Heat Recovery Steam generator (HRSG)
7 Lime and carbon silo
8 Bag house filter
9 Filter residue silo
10 Flue gas fan
11 Chimney
12 Bottom ash extraction
13 Steam turbine
14 Air cooled condenser
Type 40 | Type 50 | |||
---|---|---|---|---|
Plant feed rate capacity | 5 t/hr | 6t/hr | 5 t/hr | 6t/hr |
Max fuel consumption (t/h) | 5 | 6 | 5 | 6 |
Min fuel consumption (t/h) | 2.6 | 2.6 | 2.6 | 2.6 |
Max NCV (MJ/kg) | 18 | 18 | 18 | 18 |
Min NCV (MJ/kg) | 8 | 8 | 8.6 | 8 |
Gross capacity peak (MW) | 18.1 | 18.1 | 22.0 | 22.0 |
Corresponding NCV at max fuel consumption (MJ/kg) |
13.1 | 11 | 15.9 | 13.2 |
Gross capacity nom (MW) | 16.4 | 16.4 | 19.5 | 19.5 |
Corresponding NCV at max fuel consumption (MJ/kg) |
11.8 | 9.9 | 14 | 11.8 |
Gross capacity min (MW) | 10.0 | 10.0 | 12.0 | 12.0 |
Corresponding fuel consumption at min NCV (t/h) |
4.5 | 4.5 | 5.0 | 5.4 |
Net capacity peak (MW) | 15.2 | 18.9 | ||
Net capacity nom (MW) | 13.5 | 16.4 | ||
Net capacity min (MW) | 7.6 | 9.5 |
Region | Fuel & water resources | Detail | |
---|---|---|---|
Averøy Plant, Norway Partner: ENERGOS |
|
||
Hurum Plant, Norway Partner: ENERGOS |
|
||
Minden Plant, Germany Partner: ENERGOS |
|
||
Forus Plant, Norway Partner: ENERGOS |
|
||
Sarpsborg 1 Plant, Norway Partner: ENERGOS |
|
||
Isle of Wight Plant, UK Partner: ENERGOS |
|
||
Sarpsborg 2 Plant, Norway Partner: ENERGOS |
|