Commissioning

Commissioning a biomass or waste to energy facility is not the same as commissioning a fossil fuel plant and requires a customized approach for each fuel type. Commissioning involves all the preparation steps between a plant being installed and being fully operational. These steps include plant testing, preparing documentation, training operating staff and making appropriate changes for automation.

Our fully qualified and experienced team is dedicated to biomass and waste-to-energy plants only. Commissioning a biomass power plant for a specific fuel is essential for ensuring that a plant obtains a stable maximum capacity and is a highly specialized skill.