DP CleanTech’s well-managed global supply chain includes a dedicated quality department, diversified manufacturing facilities in Poland, and strategic partnerships with key suppliers worldwide. Such an infrastructure ensures first class quality and flexibility for your project. In 2010 DP Cleantech invested €1.5mill in a new state-of-the-art manufacturing facility in Jędrzejów, and in 2011 increased capacity by an additional 2,000 square meters to help service increasing demand. The workshop supplies boilers and auxiliary components for biomass and waste-to-energy projects throughout Europe, in addition the facility includes Inconel wall welding, a key component in the growing waste-to-energy market.
DP CleanTech’s experienced engineering and installation team can handle all aspects of the development, manufacturing and installation of the boiler island, on an EPC basis. The boiler island comprises all components of a power plant other than the turbine. It therefore includes the boiler itself (including the pressure parts), the fuel handling system, the feeding systems and the combustion waste handling system.
DP has signed an MOU with RAW Energy to develop biomass power generation and related energy projects in Sarawak, Malaysia. These projects will enable Sarawak to ‘grow its own energy’ and supply ...
Another high quality job completed by our outstanding DP workshop team! This Water Cooled Vibrating Grate was 100% designed and manufactured in our factory, and after successful operational and ...
DP is cooperating with the General Stefan Rowecki Grota School Complex No. 2 - a local Jędrzejów technical institute - to provide practical training support and scholarships across several technical ...