Design and Pre-Engineering

One of DP CleanTech’s core competences is the design and engineering of biomass and waste-to-energy combustion systems. Our original technology is present in some of the first biomass power plants in the world which are still running well today.  Pre-engineering packages are often required to provide proof of concept for the technology; or to provide a headstart on the project whilst it is awaiting certain approvals. The pre engineering phase can be conducted by DP as a standalone exercise

DP employs cutting edge CFD software to simulate the internal combustion conditions of the boiler. Our detailed knowledge of biomass and waste fuels allows each new project to be optimally designed according to the specific fuels involved and local legislative standards.

DP featured news

DP presents awards and scholarships to top performers at local Technical School

DP is cooperating with the General Stefan Rowecki Grota School Complex No. 2 - a local Jędrzejów technical institute - to provide practical training support and scholarships across several technical ...

Learn More

Major Milestone Achieved: Biovea Project Completes Line 01 Boiler Hydrostatic Pressure Test

Congratulations and many thanks to the DP Biovea project team in the Ivory Coast for successfully accomplishing a major milestone on the project. Keeping this challenging project on track has ...

Learn More

Welcome to our new colleagues Marcin and Radoslaw

We are delighted to announce the appointment of 2 new Senior Managers who will be based in our new Katowice office in Poland. Marcin Konopka Marcin Konopka has been appointed as the Deputy COO for ...

Learn More
See more news
Follow us
About Us
  • Teamwork, Excellence, Accountability, Innovation
  • 7 offices in 6 countries
  • DP technology is behind several ‘world firsts’ in waste management and biomass industries
  • 50 patents
  • ~100 employees 13+ nationalities
  • DP’s waste to energy portfolio addresses all stages of the ‘waste cycle’
More About Us